Current Setup(tower in progress):

Digging the hole for my 12m Tower!

back-yard.JPG

back-yard2.JPG



Making the cement base:

The Cage keeping cement together:

1cage.jpg

Welding a X on the Bolts holding the tower up so they do not pull out of the cement:

2bolts-welded.JPG

Soldering earthing cable to cage as the cabe needs to be part of the earthing (soldering earth cable to earth spike):

3busy-soldering.JPG

4wire-soldered.JPG

5cage-in-ground.JPG

Cage and earthing done getting ready to start mixing:

6cage-finel-prep_N_.

The result of 0.6 cube stone, 0.6 cube Sand and 8.5 Bags of cement mixed and put in a hole in the Ground:

7final-cement-base.J

Here are pics of the T-Pice that is used to pull the tower up and down;

1base-swivel.JPG

2tower--on-ground.JP

3tower-up-on-its-way

4tower-up-bolts1.JPG

5tower-up-bolts2.JPG


:-)